Menu Close

FPID 433489-1-52-01 SW 104 St and US1

Intersection safety project to improve the horizontal alignment of US-1 and create an auxiliary lane on the NB direction. Design of roadway, SPM, signalization and lighting.

FPID 430808-3-52-01 Miami Gardens Dr & Biscayne Blvd

Intersection Safety Improvement including horizontal alignment correction along Miami Gardens Drive, milling and resurfacing, addition of a pedestrian crosswalk, replacement of one traffic signal structure and addition of backplates, modification of lighting, and signing and pavement marking.

Beacon TradePort CDD

Maintenance of a network of roadway, stormwater management, sanitary sewer, and water systems that will give access and service to the industrial and commercial buildings within the development.

Two Lakes CDD

Maintenance of a network of roadway, drainage, water and sanitary sewer systems that will give access and service to 396 single family units and 1,273 townhomes and villas for a total of 1,669 residential units.

Venetian Isles CDD

Maintenance of a network of roadway, stormwater management, water and sanitary sewer systems that will give access and service to about 358 single-family dwellings and 216 townhouses.

Landmark at Doral CDD

Maintenance of a network of roadway, parking garages, drainage, water and sanitary sewer systems, and outdoor recreational areas that will give access and service to 807 condominium units, 434 town homes, 94,700 SF of retail space, 93,346 SF of office and 230,000 SF of flex office space.