Intersection safety project to improve the horizontal alignment of US-1 and create an auxiliary lane on the NB direction. Design of roadway, SPM, signalization and lighting.
FPID 433489-1-52-01 SW 104 St and US1
Miami, Florida
Intersection safety project to improve the horizontal alignment of US-1 and create an auxiliary lane on the NB direction. Design of roadway, SPM, signalization and lighting.
Miami, Florida
Intersection Safety Improvement including horizontal alignment correction along Miami Gardens Drive, milling and resurfacing, addition of a pedestrian crosswalk, replacement of one traffic signal structure and addition of backplates, modification of lighting, and signing and pavement marking.
Miami, Florida
Maintenance of a network of roadway, stormwater management, sanitary sewer, and water systems that will give access and service to the industrial and commercial buildings within the development.
Miami, Florida
Maintenance of a network of roadway, drainage, water and sanitary sewer systems that will give access and service to 396 single family units and 1,273 townhomes and villas for a total of 1,669 residential units.
Miami, Florida
Maintenance of a network of roadway, stormwater management, water and sanitary sewer systems that will give access and service to about 358 single-family dwellings and 216 townhouses.
Miami, Florida
Maintenance of a network of roadway, parking garages, drainage, water and sanitary sewer systems, and outdoor recreational areas that will give access and service to 807 condominium units, 434 town homes, 94,700 SF of retail space, 93,346 SF of office and 230,000 SF of flex office space.
Doral, Florida